|
|
EW Pilot Plants |
|
|
We design and manufacture electrowinning pilot plants for a wide variety of applications including laboratory and bench scale test programs for electrowinning copper, cobalt, nickel, chromium, zinc and other metals. Our electrowinning cells can be operated with various numbers of anodes and cathodes and the level of catholyte in the cell can be adjusted to any level giving complete flexibility in the overall plating area on the cathodes. The electrowinning cell is connected to a rectifier with variable DC voltage and amperage output with automatic constant current or constant voltage regulation regardless of resistance changes between the anode to cathode and solution concentration. Our cathodes can be manufactured from various metals including 316L stainless steel and titanium. We can supply various anode materials to include lead-calcium-tin (Pb-Ca-Sn) alloys and precious metal oxide coated titanium plate and mesh anodes such as DSA® (dimensionally stable anode). We can also supply porous anode diaphragm bags in order to keep the anolyte separated from the catholyte. The following summarizes our electrowinning pilot plants that we recently manufactured for various clients:
|
|
![]() |
Client: Moscow State Institute of Steel and Alloys (Technological
University)
SX Kinetics designed and manufactured this electrowinning pilot plant for a copper solvent extraction project in Russia. This EW pilot plant was coupled to the SX pilot plant as shown at: Laboratory SX Plant 4 |
|
|
For more details: EW Pilot Plant 1
|
||
|
Close-up view of the EW pilot plant. |
EW pilot plant shown with rectifier. |
|
|
Client: Southern Peru Copper
Corporation
SX Kinetics designed and manufactured this electrowinning pilot plant for electrowinning investigations at the Toquepala copper leach - solvent extraction- electrowinning plant in Peru. The pilot plant included the following:
For more details: EW Pilot Plant 2
|
||
|
|
Client: Erdenet Mining
Corporation SX Kinetics designed and manufactured this electrowinning pilot plant for a copper solvent extraction project in Mongolia. This EW pilot plant was coupled to the SX pilot plant shown in the background of the photo. |
|
|
For more details: EW Pilot Plant 3 ; and SX pilot plant details: Laboratory SX Plant 5
|
||
|
|
Client: Moscow State Institute of Steel and Alloys (Technological
University)
SX Kinetics designed and manufactured this electrowinning pilot plant for a University in Moscow, Russia. This EW pilot plant was coupled to the continuous leaching and SX pilot plant as shown at: Laboratory SX Plant 6
|
|
|
For more details: EW Pilot Plant 4 ; and SX pilot plant details: Laboratory SX Plant 6
|
||
|
|
Client: IMPRC SX Kinetics, Inc. designed and manufactured this electrowinning pilot plant for the electrowinning of copper, cobalt, and nickel. |
|
|
For more details: EW Pilot Plant 5
|
||
|
|
Client: Arava Mines Ltd SX Kinetics, Inc. designed and manufactured this laboratory scale electrowinning pilot plant for a copper project in Israel.
| |
|
For more details: EW Pilot Plant 6
| ||
|
|
Client: Immanuel
Technological Solutions This laboratory electrowinning pilot plant was designed and manufactured by SX Kinetics for a project to recover zinc from EAF (electric arc furnace) dust.
| |
|
For more details: EW Pilot Plant 7
| ||
|
|
Client: Minera Pampa de Cobre This electrowinning pilot plant was designed and manufactured by SX Kinetics for a copper heap leaching / solvent extraction / electrowinning project in Southern Peru. | |
|
For more details: EW Pilot Plant 8
| ||
![]() |
Client: Rio Tinto &
SNC Lavalin This electrowinning pilot plant was designed and manufactured by SX Kinetics for a copper heap leaching / solvent extraction / electrowinning project in Northern Peru.
| |
|
For more details: EW Pilot Plant 9
| ||
|
|
Client: Sary Kazna LLP Site Location: Kounrad, Kazakhstan Plant Capacity: 240 kg per day copper This electrowinning pilot plant was designed and manufactured by SX Kinetics for a copper heap leaching / solvent extraction / electrowinning project in Kounrad (near Balqash), Kazakhstan. This electrowinning plant was couple to our solvent extraction plant: Portable / Modular SX Plant 7 | |
|
For more details: EW Pilot Plant 10 To view more photos of this plant: Copper SX / EW Pilot Plant
| ||
![]() |
![]() | |
|
Client:
C.V. Geodrill Indonesia SX Kinetics provided this gold electrowinning plant to a mining company in Indonesia. | ||
|
For more details: EW Pilot Plant 11
| ||
|
|
Client: Private
Individual Site Location: Dar Es Salaam, Tanzania Plant Capacity: 20 kg gold per month This electrowinning pilot plant was designed and manufactured by SX Kinetics for production of gold from a placer deposit in Tanzania. The process consisted of vat leaching with NaCN followed by carbon adsorption and electrowinning onto steel wool cathodes.
| |
|
For more details: EW Pilot Plant 12
| ||
|
|
Client: Pacific Comex Site Location: Sonora, Mexico Plant Capacity: 20 kg gold per month This electrowinning pilot plant was designed and manufactured by SX Kinetics for a project in northern Mexico. The process consisted of heap leaching with NaCN followed by direct electrowinning onto steel wool cathodes.
| |
|
For more details: EW Pilot Plant 13
| ||
This page was last updated on 01/28/10.
| HOME | SITE MAP | SX PLANTS | EW PLANTS | LEACHING | HYDROMET | COALESCERS | SERVICES | PROJECTS | TECHNOLOGY | DOWNLOAD | CONTACT |
249 Ruttan Terrace, Suite 504, Cobourg, Ontario, Canada, K9A 5X6 Tel: +1 905 372 5981 Fax: +1 905 372 4091
© Copyright 2002 -2010 SX Kinetics, Inc. All Rights Reserved email: steven.webster@sxkinetics.com